2016年
First commissioning of the SuperKEKB vacuum system
IPAC 2016 - Proceedings of the 7th International Particle Accelerator Conference
- ,
- ,
- ,
- ,
- ,
- ,
- 開始ページ
- 1086
- 終了ページ
- 1088
- 記述言語
- 掲載種別
- 研究論文(国際会議プロシーディングス)
The first commissioning of the SuperKEKB, which is an electron-positron collider with asymmetric energies in KEK, has started in February 2016. A major task of the commissioning was the vacuum scrubbing of new beam pipes to increase the beam lifetime and decrease the background noise of the particle detector in anticipation of the coming physics run. The vacuum pressures along the ring were monitored, and the rate of decrease was measured to estimate the vacuum scrubbing effect. The residual gases were monitored at the same time. The temperatures of new vacuum components such as the bellows chambers, gate valves, and beam collimators were continuously checked. The effects of the antechambers and TiN coating on the electron cloud effect were preliminarily evaluated.
- リンク情報
- ID情報
-
- SCOPUS ID : 85015278556