Discussion on the mechanism of ground improvement method at the excavation of shallow overburden tunnel in difficult ground

Underground Space,
  • Kishida, K
  • ,
  • Cui, Y
  • ,
  • Nonomura, M
  • ,
  • Iura, T
  • ,
  • Kimura, M

1
2
開始ページ
94
終了ページ
107
記述言語
英語
掲載種別
研究論文(学術雑誌)
DOI
10.1016/j.undsp.2016.11.003
出版者・発行元
Elsevier BV

Tunnel construction opportunities involving shallow overburdens under difficult (e.g., soft, unconsolidated) grounds have been increasing in Japan. Various auxiliary methods for excavating mountain tunnels have been developed and can satisfy stringent construction requirements. The ground improvement method, which is one of the auxiliary methods for shallow overburden tunnels, has demonstrated its ability to effectively control the amount of settlement under soft ground. However, the mechanism of the ground improvement method has not been clarified, nor has a suitable design code been established for it. Therefore, because the strength of the improved ground and the suitable length and width of the improved area have not been fully understood, an empirical design has been applied in every case. In this paper, the mechanical behavior during the excavation, including that of the stabilized ground, is evaluated through trapdoor experiments and numerical analyses. In addition, the enhancement of tunnel stability resulting from the application of the ground improvement method is discussed.

リンク情報
DOI
https://doi.org/10.1016/j.undsp.2016.11.003
CiNii Articles
http://ci.nii.ac.jp/naid/120006223618
URL
http://hdl.handle.net/2433/220413
ID情報
  • DOI : 10.1016/j.undsp.2016.11.003
  • ISSN : 2467-9674
  • CiNii Articles ID : 120006223618

エクスポート
BibTeX RIS