OHTA Hiroshi

J-GLOBAL         Last updated: Jan 18, 2008 at 00:00
 
Avatar
Name
OHTA Hiroshi
Degree
Doctor of Engineering(Osaka Prefecture University), Master of Engineering(Osaka Prefecture University)

Research Interests

 
 

Research Areas

 
 

Academic & Professional Experience

 
1967
 - 
1976
Osaka Prefecture University, Research Associate
 
1976
 - 
1983
Osaka Prefecture University, Assistant Professor
 
1977
 - 
1978
Georgia Institute of Technology, Post-Doctoral Fellow
 
1983
 - 
1985
Osaka Prefecture University, Associate Professor
 
1985
 - 
2000
Osaka Prefecture University, Professor
 

Education

 
 
 - 
1967
Graduate School, Division of Engineering, Osaka Prefecture University
 
 
 - 
1965
Faculty of Engineering, Osaka Prefecture University
 

Misc

 
An Application of Sampling Inspection to Corrective Plan for Semi-Markov Production Process
AIIE Transactions   6(2)    1974
Corrective Scheme for Multistage Lot-Production Systems
IEEE Transactions on Systems, Man & Cybernetics   6(10)    1976
Technometrics   19(3) 249-257   1977
Pooling Procedure for Life-Test Data
IEEE Transactions on Reliability   28(2)    1979

Books etc

 
Introduction to Industrial and Systems Engineering(Part1)(Part2)
1981   
RECENT ADVANCES IN RELIABILITY AND QUALITY ENGINEERING Chapter 9 DESIGN OF LIFE TESTS BASED ON MULTI-STAGE DECISION PROCESS
World Scientific   2001   
INTEGRATED MODELS IN PRODUCTION PLANNING, INVENTORY, QUALITY, AND MAINTENANCE Chapter 8 A GENERALIZED INTEGRATED ECONOMIC MODEL FOR INVENTORY AND QUALITY CONTROL PROBLEMS
Kluwer Academic Publishers   2001   
An Application of Confirmation Sample Control Chart to the High-Yield Processes and Its Economic Design
Frontiers in Statistical Quality Control 7   2004   

Works

 
Survey of Traditional Industries in Sakai City
1987
Survey for Promotion of Information Systems in Osaka Prefecture
1991
Survey for Creation of New Industries in Osaka Prefecture
1992

Research Grants & Projects

 
Study on Integrated Model for Quality Control and Production Control
Project Year: 1998   
Study on Control Charts for High-Yield Processes
Project Year: 1996   
Study on Cell Manufacturing Systems
Project Year: 1996   
Mathematical Analysis on the Supply Chain Management
Project Year: 1998   
Study on Supply Chain Management