TAKATORI Norihiko

J-GLOBAL         Last updated: Jan 15, 2019 at 17:36
 
Avatar
Name
TAKATORI Norihiko
Affiliation
Rakuno Gakuen University
Section
Faculty of Environment Systems, Department of Environmental Management
Job title
Professor
Degree
(BLANK)(Hokkaido University), (BLANK)(Hokkaido University)

Research Areas

 
 

Education

 
 
 - 
1999
Graduate School, Division of Engineering, Hokkaido University
 
 
 - 
1983
Faculty of Engineering, Hokkaido University
 

Published Papers

 
A discrete particle optimization algorithm for the job-shop scheduling problem
TAKATORI Norihiko
Journal of Rakuno Gakuen University   42(2) 105-113   Apr 2018
Generation of Pareto Optimum Map for Job-Shop Scheduling
M. Watanabe, M. Furukawa, M. Kinoshita, T. Kawakami, K. Hama, N. Takatori, K. Naruse, Y. Kakazu
Intelligent Engineering Systems through Artificial Neural Networks (ANNIE'04)   14 917-922   Nov 2004   [Refereed]
Collision Avoidance for Multi-AGV by Learning Collision
M. Furukawa, M. Watanabe, M. Kinoshita, K. Hama, T. Kawakami, N. Takatori, K. Naruse, Y. Kakazu
Intelligent Engineering Systems through Artificial Neural Networks (ANNIE'04)   14 143-148   Nov 2004   [Refereed]
Vehicle Path Planning by Use of SOM
M. Furukawa, D. Kobayashi, M. Watanabe, M. Kinoshita, T. Kawakami, N. Takatori, K. Hama, K. Naruse
The 4th International Conference on Advanced Mechatronics -Toward Evolutionary Fusion of IT and Mechatronics   132-136   Oct 2004   [Refereed]
Improving Job-shop Scheduring Performance by Adding Bottleneck-Finding Parasites
高取 則彦,皆川 雅章
Intelligent Autonomus Systems   527-534   Jun 1998   [Refereed]
A Co-evolutionary Model For Jobshop Scheduling -An Experimental Study of a Multiple-progect Type Problem(共著)
CIRP-Journal of Manufacturing Systems   27(3) 235-240   1998   [Refereed]
A Coevolutionary Approach to a Multiproject-Type Scheduling Problem -An Application of Coevolution Based on Competition-
Proceedings of 1998 Japan-U. S. A. Symposium on Flexible Automation   3 1357-1360   Jul 1998   [Refereed]
A Co-evolutionary Model for Jobshop Scheduling -An Experimental Study of a Multiple-Project Type Problem-(共著)
Proceedings of the 29th CIRP International Seminar on Manufacturing Systems   197-202   May 1997   [Refereed]
Dynamic Jobshop Scheduling by Hopfield Neural Networks
Proceedings of the Japan-USA Symposium on Flexible Automation-1996-   2 1419-1422   Jul 1996   [Refereed]
A GA Based Approach to a Process Planning Problem with Geometric Constraints
TAKATORI Norihiko
INTELLIGENT ENGINEERING SYSTEMS THROUGH ARTIFICIAL NEURAL NETWORKS   369-374   Nov 1994   [Refereed]
Dynamic Job-Shop Scheduling by Hopfield-Type Neural Network
Journal of Robotics and Mechatronics   4(5) 401-406   1992   [Refereed]
Dynamic Job Shop Scheduling by Neural Network
Yukinori KAKAZU, Norihiko TAKATORI
Proc. of INTERTECHNO '90,Scientific Society of Mechanical Engineers, Hungary   231-240   Sep 1990   [Refereed]

Books etc

 
A GA Based Approach to a Process Planning Problem with Geometric Constraints(共著)
Intelligent Engineering Systems through Artificial Neural Networks, ASME Press   1994   
Improving Job-shop Scheduling Performance by Adding Bottleneck-Finding Parasites(共著)
Intelligent Autonomous Systems(IAS-5), I(]E87B3[)S Press   1998   
A Study on Evolutionary Search for Dynamical Combinatorial Problems
1999   

Research Grants & Projects

 
Study on Jobshop Scheduling Problems
Study on Project Scheduling Problems