JIANG Yujing

J-GLOBAL         Last updated: Dec 27, 2018 at 13:22
 
Avatar
Name
JIANG Yujing
Affiliation
Nagasaki University
Section
Faculty of EngineeringDepartment of Civil Engineering
Job title
Associate Professor
Degree
(BLANK), Dr.Engineering(Kyushu University)

Research Areas

 
 

Academic & Professional Experience

 
1993
 - 
1999
Faculty of Engineering, Kyushu University, Associate Professor
 

Education

 
 
 - 
1993
Civil Engineering, Graduate School, Division of Engineering, Kyushu University
 
 
 - 
1982
Mining Engineering, Faculty of Mining Engineering, -
 

Misc

 
Basic Research on the Theory and Method of Control Designing in Coal Face
Proc. of the 10th Plenary Scientific Session of the Int. Bureau of Strata Mechanics   177-184    1987
The Overall Characteristic Equation of the Main Roof and its Mechanism
Proc. of the Int. Sympo. on Modern Mining Technology   1-17    1988
Stability Analysis of an Underground Opening Considering the Elasto-Plastic Strain Softening Behavior
Proc. of the 8th Japan Sympo. on Rock Mechanics   273-278    1990
An Experimental Study on the Behavior of Discontinuous Rock Masses at Depth
the 23rd Sympo. on Rock mechanics   147-151    1991
Stability Analysis of a Deep Tunnel with the Elasto-plastic Strain Softening Behavior
Proc. 7th Int. Conf. on Computer Methods and Advances in Geomechanics   1467-1472    1991

Books etc

 
Prediction and Control of Underground Behavior in Mining
Chinese University of Mining and Technology Press   1988   
Mechanism and Prevention of Roof Falling in Mining Practices
Chinese Mining Engineering Press   1989   

Works

 
Investigation, evaluation and analysis of discontinuous rockmass
1982 - 1998
Rational design and stability evaluation of tunnel supports
1999
Stability Analysis of Underground Opening at depth
2000 - 2003
Construction of datebase for road tunnel maintenance management by using GIS
2003

Research Grants & Projects

 
Development of ground behaviour analysis due to extraction of rock mass
Project Year: 2000   
Engineering characteristics of discontinuous rock mass
Project Year: 1999   
Environmental control Systems for Subsidence due to Mining
Project Year: 1995   
Maintenance of underground opening
Project Year: 2002   
Analytical essessment of ground behaviour