論文

査読有り
2016年10月1日

中国地方における明治・大正期の水力発電所の建築的特徴

日本建築学会技術報告集
  • 高橋 奎伊
  • ,
  • 井上 亮
  • ,
  • 小林 久高
  • ,
  • 中野 茂夫

22
52
開始ページ
1149
終了ページ
1154
記述言語
日本語
掲載種別
研究論文(学術雑誌)
DOI
10.3130/aijt.22.1149
出版者・発行元
日本建築学会

After the Meiji Restoration, many hydroelectric plants were made, and it accounted for 80% of the whole until high-growth period. In this study, we investigated 22 hydroelectric plants in the Chugoku region. As a result, the following findings were revealed. ①Plan: The area of generator room is big and high-ceilinged. ②Facade and Design: At several hydroelectric plants, we can see Western-style design such as full-centered arch window. ③Remodeling: Electric equipment had renewed, but base plan and facade is preserved. These hydroelectric plants are valuable sample for understand modern architecture in Sanin-district.

リンク情報
DOI
https://doi.org/10.3130/aijt.22.1149
CiNii Articles
http://ci.nii.ac.jp/naid/130005432147
ID情報
  • DOI : 10.3130/aijt.22.1149
  • ISSN : 1881-8188
  • ISSN : 1341-9463
  • CiNii Articles ID : 130005432147
  • identifiers.cinii_nr_id : 9000018759374
  • SCOPUS ID : 84992316037

エクスポート
BibTeX RIS