2016年10月1日
中国地方における明治・大正期の水力発電所の建築的特徴
日本建築学会技術報告集
- ,
- ,
- ,
- 巻
- 22
- 号
- 52
- 開始ページ
- 1149
- 終了ページ
- 1154
- 記述言語
- 日本語
- 掲載種別
- 研究論文(学術雑誌)
- DOI
- 10.3130/aijt.22.1149
- 出版者・発行元
- 日本建築学会
After the Meiji Restoration, many hydroelectric plants were made, and it accounted for 80% of the whole until high-growth period. In this study, we investigated 22 hydroelectric plants in the Chugoku region. As a result, the following findings were revealed. ①Plan: The area of generator room is big and high-ceilinged. ②Facade and Design: At several hydroelectric plants, we can see Western-style design such as full-centered arch window. ③Remodeling: Electric equipment had renewed, but base plan and facade is preserved. These hydroelectric plants are valuable sample for understand modern architecture in Sanin-district.
- リンク情報
- ID情報
-
- DOI : 10.3130/aijt.22.1149
- ISSN : 1881-8188
- ISSN : 1341-9463
- CiNii Articles ID : 130005432147
- identifiers.cinii_nr_id : 9000018759374
- SCOPUS ID : 84992316037