1999年
35年前に施工された在来トンネルの拡幅時における挙動計測
トンネル工学研究論文・報告集
- ,
- ,
- ,
- ,
- 巻
- 9
- 号
- 開始ページ
- 183
- 終了ページ
- 188
- DOI
- 10.11532/journalte1991.9.183
- 出版者・発行元
- Japan Society of Civil Engineers
Dramatic traffic increase in modern day necessitated an extension of cross section of Tennozan tunnel, which was constructed by a side drift method 35 years ago, in a very difficult ground condition. Knowing that the initial construction had experienced large deformation and high pressure on concrete lining, a special care was taken for planning and selection of construction method. As a result of the actual extension of the tunnel cross section was completed only with minor deformation with fair confidence in tunnel stability. Displacement recorded for a ordinary section was less than 1mm at the depth of 2m and at most 3mm at surface. That recorded for an extended section, however, went up to 2-3 mm at the depth of 4-5m, and was 10-14mm at surface on the right side.
- リンク情報
- ID情報
-
- DOI : 10.11532/journalte1991.9.183
- ISSN : 1884-9091
- CiNii Articles ID : 130004387469